Description
Product Description
cnc control turning lathe machine

Specification:

Technical Data:

Optional:
1. More rotary axis
2. Spindle
3. Different power requirement
4. Upgrade controller
5. Servo motor
6. Bigger working diameter and length, etc.
7.The 4th axis for buddha and flat materials engraving
2. Spindle
3. Different power requirement
4. Upgrade controller
5. Servo motor
6. Bigger working diameter and length, etc.
7.The 4th axis for buddha and flat materials engraving

APPLICATION
>>Applicable Material: Various wood materials can be processed, such as beech, oak, pile of wood, birch, teak, Sapele, ashtree, merbau, sandalwood, rosewood and other wood material. >>Applicable Industry: For the production of solid wood furniture, solid wood staircase, wood columns, solid wood floor racks, wood decorative, wood crafts, such as rotating working pieces machining. Applies to furniture, staircases, decorative, wooden crafts manufacturing factory, etc. The final products include various cylindrical working pieces, bowl shape, tubular shape and vehicle wood crafts, such as various staircase column, Roman column, general column, tables or chairs legs, washstand, wooden vase, wooden table, baseball bat, car wooden furniture, children' s bed column, etc.

MACHINE ACCESSORIES

SAMPLES SHOW

QUALITY INSPECTION

Main methods for testing the foundation of mechanical equipment (especially the foundation of heavy equipment with high vibration, high rotation speed) ● the foundation construction unit shall provide the quality certificate of the equipment foundation (such as ratio, maintenance, strength). ● if there is doubt about the strength of the equipment foundation, the strength of the foundation can be re-measured by springback instrument or steel ball impact method. ● check the appearance of the foundation ● check the position and geometry of the foundation Preloading test of heavy equipment base is to prevent the heavy equipment due to the uneven subsidence of the foundation after installation equipment installation is unqualified preloaded pressure not less than equipment running at full capacity (the sum of the force on the basis of equipment), the heavy equipment can be installed level requirement is not high, only when the equipment test run on the basis of settlement observation.
SUCCESS CASE